The facility includes 3D printers and scanners, a CAD/CAM lab, plasma cutter, laser cutter, welding station, metrology equipment and prototyping tools.
The AMP lab construction design ties into the existing building systems and adjacent construction layout. The renovation consisted of remodeling roughly 13,300 sq. ft. consisting of interior building structure demo, building finishes demo, MEP demo with all new finishes, new mechanical, electrical and plumbing design for an industrial and manufacturing training facility.
Health + Well-Being

Building for Better Care: ASHE CHC Q+A with Rockford's Curt Lautenbach and Eric Kella

No items found.

When You'll Start to See the Amway Stadium From US 131

Health + Well-Being

Case Study: Occupied Healthcare Renovation During COVID

Lets work together.