The facility includes 3D printers and scanners, a CAD/CAM lab, plasma cutter, laser cutter, welding station, metrology equipment and prototyping tools.
The AMP lab construction design ties into the existing building systems and adjacent construction layout. The renovation consisted of remodeling roughly 13,300 sq. ft. consisting of interior building structure demo, building finishes demo, MEP demo with all new finishes, new mechanical, electrical and plumbing design for an industrial and manufacturing training facility.