Designed for durability and performance, the field’s surface reduces maintenance needs and ensures a consistent playing experience.
Poor soils on-site required our team to cut an additional 18 inches out of half of the field, which was then backfilled with sand. In all, eight inches of rough stone and one inch of fine grade finish stone was laid.
The project also featured the integration of a custom GVSU logo on the field, further enhancing the University’s brand presence.