The precast concrete construction includes 45 new dock doors and an expansive interior material racking system.
Rockford leveraged an alternative roofing process to avoid material shortages during construction, and the building can maintain internal temperatures of roughly 70 degrees through use of energy-efficient design and passive cooling systems.